"Your Construction Partner"
   Since 1970
 


CORPORATE OFFICE 800-877-4571
&
ARKANSAS BRANCH
800-877-1426

 

HOME PAGE   SITE MAP CONTACT US   BRANCH  LOCATIONS

ABOUT ICM

ICM News Page
Used Equipment
Email ICM
Construction Info
 & Link Page
Employment

We Accept

GradeStar System - Guided from Earth's Orbit !

BACK                                                      NEXT

STAKEOUT/ELEVATION DIFFERENCE

bullet

Used to stake, grade or check lineally based projects for applications such as roadways, ditching projects, airport runways and long distance trenching

bullet

The operator can see his position based on a cross section of the job, with cut and fill information available immediately on screen.

bullet

Field Based Grade Checking is a system used to stake surface geometry based on randomly or regularly spaced points.

bullet

Typical applications would be shopping centers, landfills, sub divisions, mitigation areas, industrial parks, recreational areas, golf courses and projects using typical cross sections.

bullet

Visually the operator can see and coordinate his position on screen with separate cut/fill indicators anywhere on the site.

SLOPE STAKING

bullet

Transitions, cross sections, super elevations, vertical curves, independent ditch sections and their offsets are easily and accurately handled.

bullet

Accurately locate and place slope stakes, offsets, shoulder points, centerline and catch points.

bullet

Slope staking can be user defined.

bullet

On screen slope stake report.

bullet

Story staking ( 2 Point pick ) allow the office or field personnel complete cross-section information.

POINT STORE

bullet

Points are graphically located in a design file.

bullet

Staking is completed in a fraction of the normal time.

bullet

The operator sees his position numerically and graphically on screen.

bullet

Points can bee seen on screen to help determine the best route to complete staking.

bullet

Points are easily recorded into a staking log for future use or publishing.

bullet

Save up to 80% of the cost of staking and at a fraction of the time required for conventional methods.

TRACKING/CENTERLINE TEMPLATE STAKEOUT

bulletTrack and store your current position on the jobsite.
bulletManually store points with a description.

NEXT

July 08, 2008 Copyright © 2001 ICM Ebiz Division.  ebiz@icmmail.com  We Specialize in building Construction Oriented Web Sites