"Your Construction Partner"
   Since 1970
 


ARKANSAS BRANCH 800-877-1426 
CORPORATE
800-877-4571ICM ONLINE STORE

 

 

HOME PAGE   SITE MAP CONTACT US   BRANCH  LOCATIONS

ABOUT ICM

ICM News Page
Used Equipment
Email ICM
Construction Info
 & Link Page
Employment

We Accept

Financing is available with low monthly payments!!!! Contact your sales rep for details.

 

 

Interpretation and Compliance Letters for  29 CFR Standard  1926.652
Requirement for Protective Systems
BACK
bullet[10/20/1999] Trench shields must be installed to prevent lateral movement in a collapse.
bullet[10/15/1999] Excavations may be shored with wooden shoring.
bullet[02/01/1996] Clarification of house foundation/basement excavation; Fall protection requirements.
bullet[09/07/1995] Concerns with the OSHA June 30 memorandum concerning the application of 29 CFR 1926.652 to house foundation/basement excavations.
bullet[06/30/1995] Suspension of 29 CFR 1926.652 to House Foundation/Basement Excavations.
bullet[04/05/1995] Whether or not organic rock, such as "Miami oolite rock" should be considered by OSHA as "stable rock".
bullet[03/28/1994] Safety Procedures During Gunite and Shotcrete Pool Construction.
bullet[07/16/1993] Minimum length that an excavation must be before a protective system is required.
bullet[02/19/1993] Plywood as a substitute for meeting the standard.
bullet[05/21/1992] Design of Protective Systems in Trenches.
bullet[05/21/1992] Design of protective systems for employees working in trenches.
bullet[05/05/1992] Excavation standards relating to aluminum rail.
bullet[04/15/1992] Use of plywood for shoring and support systems in trenches and excavations.
bullet[03/10/1992] Classification of soils for providing protective systems in excavations.
bullet[12/02/1991] Standards addressing excavations
bullet[11/07/1991] Design and use of trench boxes
bullet[10/01/1991] Classification and subsequent designs may be used if they have been approved by a registered professional engineer.
bullet[06/05/1991] Testing of type C soil is not necessary if employees are adequately protected.
bullet[01/09/1991] Clarification of Standards
bullet[06/26/1985] Slope should be measured from the five-foot level to grade.
bullet[10/02/1984] Interpretation of 1926.652, Table P-2
bullet[08/04/1980] Specific Trenching Requirements.
bullet[03/09/1977] Shoring sides of trenches in hard or compact soil.
bullet[09/14/1976] Specific trenching requirements as it pertains to shoring.
bullet[07/07/1976] Trenching Requirements related to banks.
bullet[11/18/1975] Clarification of excavations, trenching, and shoring standards.
 
November 15, 2011 Copyright © 2001 ICM Ebiz Division.  ebiz@icminc.us